ASU Campus Demolition
- Safely removed 31,621 tons from an active ASU campus zone
- 29,457 tons of concrete/block demolished and hauled
- 230 tons of piping and wire recycled
- 1,933 tons of interior debris hand-stripped and separated
- Continuous water application for dust control
- Recycled: 93.89% | Landfill: 6.11%


